Independent evidence in 48 hours — before you release funds.

Verify the draw
before you release the funds.

Every draw on a site you have not seen is money at risk. Independent satellite evidence in 24–48 hours for construction lenders and fund control across the US, Canada, and Mexico — licensed ~30cm before/after imagery, checklist, red flags, provenance. A human reviews every panel. First report free.

First report free on a live project of yours. One per firm. No account. No subscription.

drawsat — quick draw screen / sample-report.pdf

DrawSat.

Quick Draw Screen · Independent draw verification

REPORT DS-2026-0001 · SAMPLE
Confidential — fund-control review
Status: visible progress confirmed — 1 flag
Project

Wilson St. duplex

Lender / file

Northshore Private Credit · file 8841

Address

18 Wilson St, Laval, QC

Draw

Draw 2 of 6 — foundation

Requester

M. Patel, fund control

Delivered

25 Aug 2026 · 36h

Executive summary

Capture dated 24 Aug 2026 shows a cleared, graded pad and foundation forms in place. That matches a foundation draw. One flag: the west stockpile is smaller than the 12 Jul capture — confirm material was placed on site, not removed.

Before / after — site imagery

30cm optical · SAMPLE
BEFORE12 Jul 2026
FORMS
STOCKPILE
30cm optical · SAMPLE
AFTER24 Aug 2026

Visible-progress checklist

MilestoneClaimedObservedStatus
Site cleared / gradedYesYesConfirmed
Foundation / footingsStartedForms visibleConfirmed
Structure footprintNoNoN/A
Crane / equipmentNoNoN/A
Materials / stockpileYesYesN/A
Other visible workStockpile stableSmallerFlag

Red flags

West stockpile smaller than prior capture. Confirm use on site before releasing the full foundation draw.

DrawSat · Montreal · independent satellite evidencePage 1 of 2

Page 1 of 2 · sample format · open full report

The draw verification gap

Every draw released on a site you didn't see is a bet.

3–7 days

typical turnaround for a traditional third-party draw inspection, while modern lenders target a 1.5-day cycle to funded.

$200–$1,500

what lenders already pay per third-party draw inspection, residential to commercial.

Borrower photos

what remote-site progress verification too often relies on — evidence supplied by the party requesting the money.

The deliverable

A draw-ready evidence file. Not a data feed.

Before / after, annotated

Two dated 30cm satellite captures of the exact parcel, side by side, with AI-annotated changes: cleared land, foundations, structure footprint, equipment, stockpiles.

Visible-progress checklist & red flags

A line-by-line check of externally visible work, plus explicit red flags: no visible activity, stalled earthwork, progress inconsistent with the draw request.

Provenance you can file

Capture dates, satellite source, resolution, and processing chain documented on every report — evidence built to support draw files, dispute records, and audits.

How it works

Three steps. A PDF in 24–48 hours.

STEP 01

Send one address

Email a project address in the US, Canada, or Mexico, or use the form below. No install. No account.

STEP 02

We pull the evidence

We source dated ~30cm imagery, run AI-assisted change detection, and a human reviews every panel. Cloud cover? We flag it and fall back to radar (SAR).

STEP 03

Report in 24–48h

A draw-ready PDF: before/after panels, progress checklist, red flags, full provenance.

Limits

What this report can and cannot say.

Satellites confirm visible exterior work — site activity, earthwork, foundations, structure footprint, equipment, stockpiles, roofing. They cannot verify interiors, workmanship, permits, or lien status. Clouded optical captures are flagged; we fall back to archive imagery or SAR. A human reviews every panel before the PDF ships.

Pricing

Priced per report. Built to pay for itself.

No seats, no platform fees. First report free on a live project — then $399 to pre-screen a draw in 24–48 hours.

All prices in US dollars (USD), for projects in the United States, Canada, and Mexico alike.

Pilot Report
$0/ first report

ONE PER FIRM

Your first report, free, on a live project of yours. One per firm.

$0 to test us on a live file before you spend a dollar.

  • Full Quick Draw Screen format
  • Before/after 30cm satellite panels
  • Yours to keep either way
  • No account, no subscription
Quick Draw Screen
$399/ report

24–48H TURNAROUND

Pre-screen a draw on a residential or light-commercial site before you release funds.

$399 and 24–48h vs. a 3–7 day inspection wait — or releasing on borrower photos.

  • Before/after 30cm satellite panels
  • Visible-progress checklist
  • Red-flag summary
  • Full provenance block
Commercial Progress Evidence
$1,200/ report

48–72H TURNAROUND

For three or more capture dates, large commercial sites, or radar when cloud blocks optical.

Multi-date evidence in 48–72h when the file is larger and a 3–7 day wait still costs you cycle time.

  • Everything in Quick Draw Screen
  • Multi-date change sequence (3+ dates)
  • Equipment & stockpile analysis
  • SAR fallback for cloud cover
BEST FOR PORTFOLIOS
Lender Retainer
$2,000/ month

PORTFOLIO COVERAGE

Standing draw verification across your active portfolio, available after two paid reports.

Six screens a month, extras $299, priority 24h — standing coverage without a 3–7 day wait each time.

  • 6 Quick Draw Screens included
  • Extra screens at $299
  • Priority 24h turnaround
  • One evidence format across every file

Start here

First report is free on a live file.

Send one address. Independent evidence in 24–48 hours. Yours to keep. Prefer to talk after you request the pilot? Book a short call.

FAQ

Straight answers for lenders.

Don't release the next draw blind.
Get independent evidence first.

Free pilot

Request your free pilot report

One live project of yours. No account. No subscription.

Delivered in 48 hours. Yours to keep — whether or not we ever work together.

Prefer a short call after you request the pilot?

Book a call